News and Events
- Home
- News and Events
Our News
Successful Transition to ISO 45001:2018 and ISO 29001:2020
ACT has successfully updated its Integrated Management System to new revisions of ISO Standards and received ISO 45001:2018 & ISO 29001:2020 without any major or minor audit finding.
Drydocks World Best Subcontractor Certificate
ACT has received Best Subcontractor Performance Certificate from Drydocks World based on its unmatchable quality services.
Dubai Petroleum Long Term Project
ACT Awarded Dubai Petroleum Long term contract (5 years) for Surface Preparation and Coating Applications at Onshore & Offshore Locations.
McDermott Appreciation Certificate
Certificate of appreciation awarded to ACT by McDermott for Saudi Aramco projects
ADNOC Onshore Appreciation Certificate
ACT received certificate of Appreciatation from ADNOC Onshore (Al Dhafra Petroleum) for 5 Million Safe Manhours without LTI
DEWA Appreciation Certificate
DEWA awarded apprecitation certificate for achieving 18 Million Safe Manhours without LTI at Jamex M Project
Entry into Drydocks World, Dubai
Gained full fledged entry into Drydocks World, Dubai for their Blasting, Coating, PFP & TSA application projects
ADNOC In-Country Value Certificate
ACT International Oil Field Services LLC received ADNOC In-Country Value Certificate
RTA approval for Shindagha Bridge -Besix
ACT received project specific RTA approval for Shindagha Bridge -Besix
L&T Long Term Project for EGA
L&T awarded long term project to ACT for Scaffolding, Blasting and Painting of Alumina Refinery Process Tanks at Emirates Global Aluminium, Abu Dhabi (EGA)
Saudi Aramco Approval
ACT received Saudi Aramco approval for execution of major projects in UAE
ODC Long Term Contract
Oman Drydock Company (ODC) awarded long term Blasting and Painting contract to Applied Corrosion Technology.
Siemens Three Years Long Term Contract
Siements awarded 3 year Long Term Contract for DEWA M Expansion (Jamex) Project
ACT Branch Office in Oman
To cope with growing demand and keeping in view the progressive economy of Oman, Applied Corrosion Technology as decided to open its branch office in Oman and even science ACT is extending is cooperation to DUQM.
ACT International Oil Field Service LLC, ISO 9001:2008 Accreditation
We are proud to announce ACT International Oil Field Service LLC, our Abu Dhabi Branch for attaining ISO 9001:2008 Certification.
September 10th, 2014
DUBAI CIVIL DEFENCE certification
Applied Corrosion Technology L.L.C maintains its DUBAI CIVIL DEFENCE certification for application of Intumescent coatings.
Intumescent coatings are used to preserve the structural integrity of a steel framed building in a fire to prevent collapse and allow sufficient time for evacuation and fire fighting
Intumescent coatings are paint-like materials which when subjected to heat, swell to form an insulative char. This phenomenon is used to protect the integrity of a steel structure against the effects of fire thus allowing safe evacuation of public areas,” “Modern designs often now involve the use of the steel structure as part of the architectural feature of the building. When steelwork is expressed in this manner, the only real option for fire protection is an intumescent coating system such as the Steel Master.”
June 23rd, 2014
Dubai PFP Unit
ACT in Dubai have bought a couple of ECCO PFP units, this is the third one purchased being trialled
December 18th, 2014
Certification for internal and external paint coating system
Applied Corrosion Technology is recognised by international Paint Protective Coating as Competent applicator for the application of internal and external paint coating system.November 23th, 2013
ACT Internal & External Systems applicator of Caboline Products Certified
APPLIED CORROSION TECHNOLOGY Certified as an Internal and External Systems applicator of Caboline Products
November 16th, 2013
Certified by PPG
ACT is Certificate by PPG for the internal coating comment Internal coating application of Jet fuel Tanks, Pipeline & vessels.
November 16th, 2013
New Head Office
On 1st of July, 2012, ACT moved into their new head office located in Business Bay, in an eco-friendly building; O-14 Tower, a.k.a Swiss Cheese building. This move again proves that despite the tough market conditions, ACT is well on its way towards growth and expansion.
July 31st, 2012
Fabrication
Due to significant client demands in recent years we have increased our scope by investing heavily in developing our own yard of 23,000 sq.mtrs on a large scale in Hamriyah Phase II, which comprises apart from the fabrication facility, an eight wheel auto blast machine, a state of the art closed blasting shed with automatic feed conveyors, recycling system, dual chamber blast pots and painting shed with extraction and filtration systems which has allowed us to drastically increase and improve our capabilities.
Our dedicated workforce consists of qualified SMAW, MIG, TIG welders, pipe & structural fabricators, Sandblasters and Spray painters led by a team of qualified production and quality control engineers
Our equipment and machinery list consists of plate rolling machine, drilling machines, welding machines for both carbon steel and stainless steel, automatic and manual cutting sets, hydraulic press, forklifts upto 20 Ton capacity, 10 ton transportation truck etc.
April 18th, 2011
ISO 14001
Today ACT has achieved yet another milestone by obtaining ISO 14001:2004. ACT is committed to maintain high standards in Health, Safety and Environment throughout the organization.
January 9th, 2011
Abu Dhabi Office
With the growing demand for surface protection and the pace of construction in Abu Dhabi, it was only common sense for ACT to open its doors to the Emirati capital. ACT has acquired its trade license for Abu Dhabi in the name of ACT International Oilfield Services with its office opened in Mussaffah.
This new set would allow us to compete in newer and bigger markets at the same time support our existing clients in a location of their convenience.
October 28th, 2010
ADMA OPCO Approval
In 2009, ACT obtained an approval from Abu Dhabi Marine Operating Company (ADMA OPCO), a leading member in Abu Dhabi National Oil Company (ADNOC) as a preferred vendor for surface preparation, coatings and passive fire protection.
This sought-after authorization gives ACT access to a number of offshore projects within the Abu Dhabi sphere of the Arabian Gulf including drilling rigs, support vessels, platforms, SPMs and tankers. In addition, this relationship can facilitate ACT tendering to ADNOC and its related organizations.
June 15th, 2010
Hamriyah Free Zone (HFZ)
In 2009, Lamprell Energy, one of ACT’s biggest clients, began to operate a new 51,000 sq meter facility in Sharjah Hamriyah Free Zone. This coupled with the addition of 195 meters of quayside access gave Lamprell an edge over its clients when competing for new build construction of jack-up rigs and deep water drilling units as well as refurbishment of vessels with a draft of 9 meters
Once again Lamprell requested ACT’s collaboration in surface preparation and coating.
Thus to enhances ACT’s relationship with Lamprell it had setup a site office in HFZ.
June 5th, 2010
Employee Felicitation
ACT appreciated its long-standing site employees with awards, mementos and cash rewards on 11th of December 2010. The felicitation ceremony was held at ACT’s Hamriyah Freezone and Jebel Ali Free Zone sites.
Honorable members from the executive management were present to encourage the employees and reward them for their contribution towards the organization.
December 11th, 2010
Abu Dhabi Office
With the growing demand for surface protection and the pace of construction in Abu Dhabi, it was only common sense for ACT to open its doors to the Emirati capital. ACT has acquired its trade license for Abu Dhabi in the name of ACT International Oilfield Services with its office opened in Mussaffah.
This new set would allow us to compete in newer and bigger markets at the same time support our existing clients in a location of their convenience.
October 28th, 2010
ADMA OPCO Approval
In 2009, ACT obtained an approval from Abu Dhabi Marine Operating Company (ADMA OPCO), a leading member in Abu Dhabi National Oil Company (ADNOC) as a preferred vendor for surface preparation, coatings and passive fire protection.
This sought-after authorization gives ACT access to a number of offshore projects within the Abu Dhabi sphere of the Arabian Gulf including drilling rigs, support vessels, platforms, SPMs and tankers. In addition, this relationship can facilitate ACT tendering to ADNOC and its related organizations.
June 15th, 2010
Hamriyah Free Zone (HFZ)
In 2009, Lamprell Energy, one of ACT’s biggest clients, began to operate a new 51,000 sq meter facility in Sharjah Hamriyah Free Zone. This coupled with the addition of 195 meters of quayside access gave Lamprell an edge over its clients when competing for new build construction of jack-up rigs and deep water drilling units as well as refurbishment of vessels with a draft of 9 meters
Once again Lamprell requested ACT’s collaboration in surface preparation and coating.
Thus to enhances ACT’s relationship with Lamprell it had setup a site office in HFZ.
June 5th, 2010
Employee Felicitation
ACT appreciated its long-standing site employees with awards, mementos and cash rewards on 11th of December 2010. The felicitation ceremony was held at ACT’s Hamriyah Freezone and Jebel Ali Free Zone sites.
Honorable members from the executive management were present to encourage the employees and reward them for their contribution towards the organization.
December 11th, 2010
Fabrication
Due to significant client demands in recent years we have increased our scope by investing heavily in developing our own yard of 23,000 sq.mtrs on a large scale in Hamriyah Phase II, which comprises apart from the fabrication facility, an eight wheel auto blast machine, a state of the art closed blasting shed with automatic feed conveyors, recycling system, dual chamber blast pots and painting shed with extraction and filtration systems which has allowed us to drastically increase and improve our capabilities.
Our dedicated workforce consists of qualified SMAW, MIG, TIG welders, pipe & structural fabricators, Sandblasters and Spray painters led by a team of qualified production and quality control engineers
Our equipment and machinery list consists of plate rolling machine, drilling machines, welding machines for both carbon steel and stainless steel, automatic and manual cutting sets, hydraulic press, forklifts upto 20 Ton capacity, 10 ton transportation truck etc.
April 18th, 2011
ISO 14001
Today ACT has achieved yet another milestone by obtaining ISO 14001:2004. ACT is committed to maintain high standards in Health, Safety and Environment throughout the organization.
January 9th, 2011
New Head Office
On 1st of July, 2012, ACT moved into their new head office located in Business Bay, in an eco-friendly building; O-14 Tower, a.k.a Swiss Cheese building. This move again proves that despite the tough market conditions, ACT is well on its way towards growth and expansion.
July 31st, 2012
Dubai PFP Unit
ACT in Dubai have bought a couple of ECCO PFP units, this is the third one purchased being trialled
December 18th, 2014
Certification for internal and external paint coating system
Applied Corrosion Technology is recognised by international Paint Protective Coating as Competent applicator for the application of internal and external paint coating system.November 23th, 2013
ACT Internal & External Systems applicator of Caboline Products Certified
APPLIED CORROSION TECHNOLOGY Certified as an Internal and External Systems applicator of Caboline Products
November 16th, 2013
Certified by PPG
ACT is Certificate by PPG for the internal coating comment Internal coating application of Jet fuel Tanks, Pipeline & vessels.
November 16th, 2013
ACT International Oil Field Service LLC, ISO 9001:2008 Accreditation
We are proud to announce ACT International Oil Field Service LLC, our Abu Dhabi Branch for attaining ISO 9001:2008 Certification.
September 10th, 2014
DUBAI CIVIL DEFENCE certification
Applied Corrosion Technology L.L.C maintains its DUBAI CIVIL DEFENCE certification for application of Intumescent coatings.
Intumescent coatings are used to preserve the structural integrity of a steel framed building in a fire to prevent collapse and allow sufficient time for evacuation and fire fighting
Intumescent coatings are paint-like materials which when subjected to heat, swell to form an insulative char. This phenomenon is used to protect the integrity of a steel structure against the effects of fire thus allowing safe evacuation of public areas,” “Modern designs often now involve the use of the steel structure as part of the architectural feature of the building. When steelwork is expressed in this manner, the only real option for fire protection is an intumescent coating system such as the Steel Master.”
June 23rd, 2014
ACT Branch Office in Oman
To cope with growing demand and keeping in view the progressive economy of Oman, Applied Corrosion Technology as decided to open its branch office in Oman and even science ACT is extending is cooperation to DUQM.
ODC Long Term Contract
Oman Drydock Company (ODC) awarded long term Blasting and Painting contract to Applied Corrosion Technology.
Siemens Three Years Long Term Contract
Siements awarded 3 year Long Term Contract for DEWA M Expansion (Jamex) Project
L&T Long Term Project for EGA
L&T awarded long term project to ACT for Scaffolding, Blasting and Painting of Alumina Refinery Process Tanks at Emirates Global Aluminium, Abu Dhabi (EGA)
Saudi Aramco Approval
ACT received Saudi Aramco approval for execution of major projects in UAE
DEWA Appreciation Certificate
DEWA awarded apprecitation certificate for achieving 18 Million Safe Manhours without LTI at Jamex M Project
Entry into Drydocks World, Dubai
Gained full fledged entry into Drydocks World, Dubai for their Blasting, Coating, PFP & TSA application projects
ADNOC In-Country Value Certificate
ACT International Oil Field Services LLC received ADNOC In-Country Value Certificate
RTA approval for Shindagha Bridge -Besix
ACT received project specific RTA approval for Shindagha Bridge -Besix
ADNOC Onshore Appreciation Certificate
ACT received certificate of Appreciatation from ADNOC Onshore (Al Dhafra Petroleum) for 5 Million Safe Manhours without LTI
Dubai Petroleum Long Term Project
ACT Awarded Dubai Petroleum Long term contract (5 years) for Surface Preparation and Coating Applications at Onshore & Offshore Locations.
McDermott Appreciation Certificate
Certificate of appreciation awarded to ACT by McDermott for Saudi Aramco projects
Successful Transition to ISO 45001:2018 and ISO 29001:2020
ACT has successfully updated its Integrated Management System to new revisions of ISO Standards and received ISO 45001:2018 & ISO 29001:2020 without any major or minor audit finding.
Drydocks World Best Subcontractor Certificate
ACT has received Best Subcontractor Performance Certificate from Drydocks World based on its unmatchable quality services.
Testimonials
C. Moskera | Project Supt.
Gulf Marine Services WLL
S. Cross | Manager Operations
ENSCO Oceanics International Com.
A. Warburton | Paint & Coating Insp.
Santa Fe Drilling Operations, INC
I. Opedal
Aerotest Limited
J.A. Marti | Leighton Loadout Manager
Leighton Offshore
C. Moskera | Project Supt.
Gulf Marine Services WLL